Then and Now
An HCC Campus Center Renovation Retrospective
-
West Side, before
-
West Side, after
-
West Side, before
-
West Side, After
-
New Campus Center entrance
-
New bridge over Tannery Brook
-
1st floor lobby and old bookstore entrance
-
First floor lobby, after
-
Then: First floor hallway
-
Now: Admissions hallway
-
1st floor stairs, before
-
1st floor stairs, after
-
2nd floor, small dining room, before
-
Now: the new College Store
-
Stairwell, looking down from second flloor, then
-
And now ...
-
Food court, before
-
Food court, after
-
Food court, before
-
Food court, after
-
Food court, before
-
Food court, after
-
Dining room, before
-
Dining room, after
-
Faculty dining room, before
-
Faculty dining room, after
-
Dining room, then
-
Dining room, now
-
Then, old cafeteria
-
Now, Student Engagement
-
Then, old cafeteria
-
Now: Student lounge, College Store
-
Then, old cafeteria
-
Now, student lounge, College Store
-
Then, cafeteria looking out to balcony
-
Now, Student Engagement
-
Then, exterior balcony
-
Now, chill zone
-
Then, exterior balcony
-
Now, expanded lounge/dining area
-
Second floor exit, before
-
Second floor exit, after
-
The Pit, looking up
-
And now, atrium stairwell
-
Then, pit looking down from Courtyard
-
Now, new atrium stairwell
-
And new Courtyard entrance